Skip to main content
Home/ Industries/ Building management
Property Management · Facility Management

More buildings.
One specification.
Fewer interventions.

A property manager overseeing a portfolio of buildings cannot keep sending a crew out because of odours from the drains. They need a systematic solution that reduces the number of work orders and keeps tenants happy. Green Drain™ is a one-off purchase that lasts about five years.

EN 1253ASSE 1072-20205-year lifespanPassive
Less
Odour complaint
Less
Call-outs
5 years
Life
Standard
Specification
Problem & solution

What the work-order system sees.

An odour complaint is a classic work order in facility management. The technician arrives, flushes the trap, and is back two to four weeks later with the same issue. Labour costs climb and the tenant starts to question the building's quality.

Without Green Drain™

  • Odour complaint — 30 – 60 minutes per call, plus travel time.
  • A call-out does not deal with the cause — it treats the symptom, refills the trap and leaves.
  • The smell comes back — same location, every two or three weeks.
  • Corporate tenants have options — a bad impression costs you the renewal
  • The FM contract carries KPIs for response time and open tickets, and both push costs up.

With Green Drain™

  • Removes the main cause of odour complaints for five years.
  • Standardised across the portfolio — one specification for procurement
  • Fewer FM call-outs per building
  • Contribution to the building's LEED/BREEAM rating (sustainability)
  • ASSE 1072-2020 test report and EN 1253 compatibility data for corporate procurement
Croatian FM

The sector is professionalising.

The FM industry in Croatia is rapidly developing. Corporate clients are demanding ESG and sustainability metrics. Odour complaints are one of the most common work-order types — the solution is quickly evolving toward passive systems that don't require repeated interventions.

ESG
Contribution to the sustainability report — chemical-free, long-lasting
KPI
FM contracts carry measurable KPIs — fewer call-outs means a better score.
EN 1253
The specification covers most European gullies.
ASSE 1072
2020 Edition — Trap Seal Device Standard
5 years
Coverage in a single procurement — CapEx, not OpEx
0 €
Lifecycle maintenance cost
Data Sources and Regulatory Framework (2024–2025 data)

Statistical data were taken from official sources: State Statistical Office (data.dzs.hr) Croatian Institute of Public Health (hzjz.hr), Ministry of Labor, Pension System, Family and Social Policy (mrosp.gov.hr), Agency for Science and Higher Education (azvo.hr), Ministry of Tourism and Sports (mint.gov.hr). Regulatory framework: EUR-Lex for EU directives and regulations — Regulation (EU) 2017/745 (MDR), Regulation (EC) No 178/2002 (general principles of food law), Regulation (EC) No 852/2004 (food hygiene — HACCP obligation), Regulation (EC) No 1935/2004 and Regulation (EU) No 10/2011 (food contact materials), Regulation (EU) No 528/2012 (BPR), Directive 2014/34/EU (ATEX). Standards: EN 1253-1 (floor P-traps, water seal ≥50 mm), EN 1253 Parts 6/7/8 (gullies with a water seal below 50 mm, with mechanical closure, and combined types; 2023 editions), ASSE 1072-2020 (floor drain trap seal protection devices) and NSF/ANSI 2 (food equipment). HACCP International RG-04 is a private certification programme operated by HACCP International, not an official certification issued by a public authority. Tourism data taken from the DZS publication for H1 2025, healthcare data from the HZJZ report 2024, data for education from DZS publications for the 2023/2024 and 2024/2025 school years, data for nursing homes from the MROSP report, and announcements of EU-funded construction in 2025. Revision date: May 2026.

Implementation

Rolling it out across the FM portfolio.

The property manager takes the specification, no new odour work orders are raised for the facility — the recommendation is being rolled out across the portfolio.

01

Pilot building

A building with a history of odour complaints — pilot install and a 90-day evaluation.

02

Measurement

Open tickets counted before and after, for the sustainability report.

03

Specification

Central procurement takes over the specification for the rest of the portfolio.

04

Roll-out

Buildings done in priority order — typically 6 to 18 months.

Model Recommendation

Recommendations across the whole portfolio.

A typical FM portfolio in Croatia is a mix of office buildings (40–60 %), hotels (20–30 %), retail centres (10–20 %), and industrial facilities (5–10 %). Standardisation across the portfolio — GD 2 and GD 3 together cover ~80 % of needs. Central procurement handles all sizes in a single tender.

Green Drain™ Recommended for your industry.

  • Offices and hotel bedrooms (~55 % of the portfolio)GD 2. Largest volume procurement.
  • Wellness, F&B, sports (~20 %)GD 3HoReCa standard.
  • Industrial facilities and larger garages (~10 %)GD 4.
  • Large channel drains (~5 %)GD 5 or GD 6CRAC plant and central kitchen channels.
💬 Not sure of the exact size? Send us a photo of your sink drain — our technical team will respond with a written recommendation within the same business day, free of charge.
Check out Green Drain™ → Request a quote
GD 2
50–58 mm · ~55 % of the portfolio
GD 2.5
55–65 mm · ~10 % (older)
GD 3
75–85 mm · ~20 % of the portfolio
GD 3–3.5
80–89 mm · adaptive
GD 4
102–110 mm · ~10 % (industrial)
GD 5/6
120–135 mm-150 · ~5 % (specific)
Complete solution

Three products.
One protection portfolio.

Green Drain™ doesn't work alone — for maximum drain control it's combined with GD Uri-Tabs™ (urinals) and GreenSwirl™ (drain unblocking).

Ready for Free audit?

We come to the site, map the drains, and provide a written recommendation — no cost, no obligation.